Nook & Cranny Creations - Stylish Living Solutions, Bedroom Comforts & Outdoor Essentials
Nook & Cranny Creations - Stylish Living Solutions, Bedroom Comforts & Outdoor Essentials Nook & Cranny Creations - Stylish Living Solutions, Bedroom Comforts & Outdoor Essentials
Cart(0)
Home Living Solutions Armchairs
Product Details

It has been clinically proven that the use of a saddle stool is able to build muscle as the stool forces the user to sit up straight thus building both your upper leg, buttocks, abdominal and leg muscles. The proper way to sit in a saddle stool is at a 135-degree angle with your legs spread out in a way called hip abduction to stabilize the pelvis in an upright orientation. This sitting stance helps to improve balance, hand acuity and strength over time. However, the user typically sits in a higher position and must adjust its work surface to a higher height as well.

The Flight Saddle stool is the newest product to be added to the Flight family of operatory stools. The saddle stool is a multi-purpose stool that is appropriate for dental, medical, podiatry, ENT, beauty, spa, tattoo, veterinarian, lab, technical and office use. Saddle stools are very similar in look, design and feel as an equestrian saddle. The saddle design for seating comes with a pneumatic gas cylinder to allow the user to adjust the correct height to reach the optimal angle of 135 degrees between the hips and knees. On traditional chairs, your hips and knees are typically at a 90-degree angle causing most people to naturally slouch or hunch over and over time this can lead to chronic shoulder and back pain. A 135-degree angle promotes proper posture and allows your spine to be in a healthy lordotic curved position that helps to reduce the pressure and stress on your spinal cord and to create a stronger core.

FEATURES:

  • Improved Blood circulation
  • Back, shoulder and neck pain relief with better posture
  • Better Digestion because the spine is in its natural lordotic curved position
  • Reduced work-related disorders such as pain and aching in the wrists, arms and shoulders associated with the regional musculoskeletal disorder
  • Decrease pain and fatigue
  • Great for Dental Offices, Dental Hygienist, Dentist, Medical, Veterinary, Doctors, Salons, Beauty, Tattoo or any Professional who works at a desk or workstation for long hours
  • No tilt option.

DIMENSIONS & WEIGHT:

  • Single Lever Height Adjustment
  • English Style Saddle
  • Gas Cylinder for different height adjustments
  • Polished Aluminum Base – Small footprint for closer access
  • 5 Casters suitable for carpet, hardwood floor, and tiles
Seat Height 21.6” to 29.5” (55-75cm)
Base Diameter 18.9” (48cm)
Seat Depth 14” (35.5cm)
Seat Width 17.1” (43.5cm)

 

Item Number: SHFSSAD-600

PLEASE NOTE:  This chair requires 3-5 Business  handling time.

 

English Style Saddle Ergonomic Stool - Decrease Pain and Fatigue

  • DefaultTitle

$ 57.56

$ 74.83

Please select combo product attributes
The combo subtotal is $,SAVE$
Unavailable

You May Also Like

Beam Bowl

$ 19.99

Beam Bowl

$ 32.00

$ 55.00

LOTSO UMBRELLA
Beckett 4ft Window Box

$ 43.62

$ 56.71

Beckett 4ft Window Box
Cart
Nook & Cranny Creations - Stylish Living Solutions, Bedroom Comforts & Outdoor Essentials
Your cart is currently empty.